Opens in a new tab

Packaging systems configured around your application Defined project scope

Share your requirements • sales@ewpackmachinery.com

INMAYPACK · Shanghai · Since 2009

Why Choose INMAYPACK for Packaging Machinery

Doypack, sachet, premade-pouch and coffee equipment, configured around your product and package.

Start with your product or equipment range and the details you have. Drawings can follow during project review.

  • Doypack systems
  • Sachet & stick packs
  • Premade pouches
  • Coffee packaging
INMAYPACK packaging machinery workshop in Shanghai, China
Since 2009Flexible packaging machinery
ShanghaiEngineering and manufacturing
Product firstFilling and package reviewed together
Defined scopeEquipment, tests and delivery agreed

About INMAYPACK

Packaging machinery from Shanghai.

INMAYPACK manufactures flexible-packaging and coffee-packaging machinery. The range covers roll-film doypack systems, sachet and stick packs, premade-pouch filling, and selected coffee filling and sealing applications.

Review the product, package, dosing method, tooling and operating requirements together. The proposal identifies the selected model, included equipment and project responsibilities.

For connected equipment, turnkey packaging solutions define the supplied machines and their interfaces.

Records and references to review

Explore the source that answers your next equipment or supplier question.

Documented equipment

12-head spout-pouch build

Inspect factory photographs and the recorded premade-pouch, piston-filling and capping configuration. Discuss the tests needed for your own product and pack.

Why choose INMAYPACK

Six priorities for your packaging project.

Your team can review the inputs and scope at each stage. The proposal defines the included documents, tests and services.

01 · Product fit

Start with the real product

Review flow, viscosity, particles, dust, foaming and dose range so that the filler and package process work together.

Review togetherProduct and pack inputs; application questions.

02 · Equipment choice

Compare the right packaging routes

Review roll-film HFFS, sachet, stick-pack, premade-pouch and coffee formats before selecting the equipment configuration.

Review togetherSelected route, model, dosing equipment and tooling.

03 · Line coordination

Connect the selected functions

Define feeding, filling, coding, inspection, conveyors and downstream equipment with clear handoff responsibilities.

Review togetherInterface list and responsibility split.

04 · Sample review

Use representative materials

Discuss trials using your product, film, pouch or capsule components and review filling, handling and seal quality.

Review togetherMaterials, running conditions, observations and limits.

05 · Acceptance

Agree what a successful run means

Set the test product, package, finished-pack output, quality checks and records before pre-shipment acceptance.

Review togetherAgreed criteria, records and open items.

06 · Handover

Plan the move into production

Confirm manuals, drawings, training, commissioning, spare-parts information and support arrangements in the project proposal.

Review togetherAgreed documents, training, spares and service scope.

Packaging machinery capabilities

See the equipment behind your project.

These photographs illustrate equipment families. Each proposal identifies the selected model, filler, tooling and included functions.

HMK420FED roll-film doypack equipment reference with selected filling equipment

Roll-film pouch systems

Doypack Packing Machines

Review stand-up, zipper, spout and shaped pouch configurations with selected forming tools and fillers.

Explore this equipment range →
DXD900 multi-lane powder sachet packaging equipment reference

Portion-pack equipment

Sachet & Stick-Pack Machines

Compare flat sachets and multi-lane portion packs for powder, liquid and granule applications.

Explore this equipment range →
ZP-8R200 rotary premade pouch packing equipment reference

Supplied-pouch filling

Premade Pouch Packing Machines

Review rotary, linear and application-specific handling, filling and sealing for manufactured pouches.

Explore this equipment range →
CF80 coffee capsule filling and sealing equipment reference

Coffee filling and sealing

Coffee Packaging Machines

Explore capsule, pod, coffee powder, coffee bean and selected secondary-packaging routes.

Explore this equipment range →

Application engineering

Look closely at the functions that affect your pack.

Ask to review the relevant mechanisms and operating conditions alongside the overall machine proposal.

HMK series pouch-forming and film-feed mechanism reference

Film handling

Review the production laminate, web path, print registration and forming tools for roll-film applications.

Vacuum suction-cup pouch-opening mechanism reference

Pouch opening

Match pouch gripping and opening to the supplied pack, product access and selected handling configuration.

Doypack machine sealing-jaw mechanism reference

Sealing process

Review seal area, product contamination, temperature, pressure and cooling with the actual package material.

Mechanism photographs are references from selected equipment. Your machine drawing defines the delivered arrangement.

Reviewing a product or package?

Share what you know about the product or packaging format. Drawings and detailed operating conditions can follow.

Request My Machine Recommendation

Working with INMAYPACK

From your first brief to production handover.

Use a clear sequence so that each project decision builds on the confirmed product and package requirements.

01

Share the application

Start with the product or equipment you are evaluating. Add a pack photo and any known fill size or output target.

02

Review the machine route

Compare the package-making method, filler, closure, cleaning needs and selected line equipment.

03

Define the proposal

Record the configuration, layout, interfaces, utilities, documents, price, delivery and service scope.

04

Review samples and test plans

Agree representative materials, sample-review needs, test conditions and acceptance priorities.

05

Complete pre-shipment checks

Review the agreed FAT results, running evidence, documents, deviations and remaining work.

06

Plan installation and support

Confirm site readiness, commissioning, training, parts and support responsibilities for the delivered equipment.

Demonstration and acceptance

Review evidence for your production conditions.

Useful machine evidence names the product, dose, package material, filler, run conditions and quality checks. Ask for footage and records relevant to the proposed equipment, then agree which conditions will be demonstrated before shipment. For liquid pouch projects, see how to evaluate a liquid packaging equipment supplier using the same evidence gates for application fit, trials and handover.

A factory acceptance test (FAT) reviews the agreed functions at the supplier facility. Site acceptance and production startup depend on installation, utilities, upstream supply and downstream interfaces.

Use the route-specific FAT and integration guides above to prepare your review. The agreed test plan defines acceptance for your configuration.

Discuss the sample review and delivery scope.

Tell us which product and pack conditions matter most to your production team.

Discuss My Project & Test Plan

A clear proposal

Confirm the terms that matter to your purchase.

Before ordering, confirm the company named in the quotation and contract, selected configuration, scope boundaries and open requirements. Record equipment, responsibilities and commercial terms in the project documents.

Machine & output

Product, package, dose, model, filler, run conditions and accepted-output basis.

Price & delivery

Included equipment, exclusions, trade terms, documentation and agreed delivery basis.

Destination requirements

Applicable destination requirements and supporting documents for the delivered configuration.

Warranty & service

Coverage, start date, parts, remote support, field service, travel and response arrangements.

FAT & site acceptance

Materials, duration, quality checks, deviations, site dependencies and retained records.

See how a configuration affects the quotation

The CF240 reference separates base-machine costs, options, inclusions and FOB Shanghai terms. Its source quotation is undated; request a current quotation for your configuration.

Review the CF240 configuration budget example →

Buyer questions

Why INMAYPACK FAQ.

What types of packaging equipment does INMAYPACK offer?

INMAYPACK offers doypack, sachet and stick-pack, premade-pouch and coffee packaging equipment. Start with your intended package, then review the model, dosing method, tooling and included functions for your product.

Where is INMAYPACK based, and how can I confirm company information?

INMAYPACK is based in Shanghai, China, and has worked in flexible packaging machinery since 2009. For supplier approval, confirm current company details and the entity named in your quotation and contract.

What should I send for an initial discussion?

Start with your product or equipment range and the information you have. A pack photo, known fill amount or output target can begin the discussion. Detailed drawings, materials and site inputs can follow; the worksheet is optional.

Can I review samples, machine videos or relevant references?

Tell us which product and package you are evaluating. We can discuss relevant equipment references and available sample-review options. For a video or trial, identify the configuration, materials and conditions, then agree any further testing needed.

Can INMAYPACK help with a complete packaging line?

Our turnkey packaging solutions coordinate selected equipment and interfaces. Confirm the supplied machines, buyer-provided items and each party’s responsibilities. Identify factory-connected tests separately from checks that depend on installation and site conditions.

How are performance, warranty and service terms confirmed?

The current quotation and agreed project documents define these terms. Performance relates to the specified product, package, configuration and test conditions. Confirm coverage, parts, training and installation arrangements through the project’s service and support scope.

How should I use the public records and references here?

Organizer reports show public brand listings; the build record shows a specific equipment configuration. The CF240 budget example has an undated source quotation, so request current terms. The optional worksheet helps organize requirements and compare scope; it is not a quotation or acceptance report.

Start your packaging project

Discuss your packaging project.

Tell us which product, equipment range or supplier questions you are evaluating. Share the information you have; drawings and detailed technical inputs can follow.

sales@ewpackmachinery.com

Tell Us About Your Packaging Project

Send your product and package details. INMAYPACK will review the application before recommending a machine configuration.

✓ Application reviewed before recommendation

✓ Project details stay private

✓ Configuration-specific technical reply