The source itself states that dose, pouch size and output require confirmation after receipt of product samples, packaging material and final testing. Put those conditions into the URS and FAT protocol.
Controlled samplesApproved product, pouch drawing, laminate, zipper or fitment and fill range.
Agreed run basisTarget duration, product condition, format, filler, lane count and downstream state.
Accepted resultsGood output, dose tolerance, pouch-opening failures, seal defects, rejects and restart checks.
Handover boundaryAs-built configuration, recipes, change parts, manuals, training, spare parts and service scope.